Standard grade TEM support grids are available in copper, nickel or gold, or in copper with one side flash coated with palladium for identification purposes. All grids are available in 3.05mm diameter and some in 2.3mm diameter. All Agar grids are packed in tubes of 100, unless otherwise specified. A comprehensive table of grid parameters is available on request.
- Extensive range of grids for TEM applications
- Square, hexagonal, rectangular, parallel, slot & round mesh shapes
- Finder & folding grids
- 50, 75, 150, 200, 300, 400, 600, 700, 1000, 1500 & 2000 mesh
- Copper, nickel, gold, gilded & platinised
- Special metals: aluminium, molybdenum, stainless steel & titanium
- Parallel Bar 200 Mesh with Single Bar TEM Support Grids200 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 13 daysFrom £22.29Average lead time: 13 days
- Parallel Bar 300 Mesh with Single Bar TEM Support Grids300 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 13 daysFrom £22.30Average lead time: 13 days
- Parallel Bar 400 Mesh with Single Bar TEM Support Grids400 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids. Special prices valid while stocks last.Average lead time: 1 to 44 daysFrom £15.83Average lead time: 1 to 44 days
- Folding 50/50 TEM Support GridsFolding TEM support grids. 50/50 mesh, 3.05mm diameter. Copper, Copper/Palladium, Nickel or Gold.Average lead time: 13 daysFrom £45.62Average lead time: 13 days
- Folding 50/100 TEM Support GridsFolding TEM support grids. 50/100 mesh, 3.05mm diameter. Copper, Copper/Palladium, Nickel or Gold.Average lead time: 13 daysFrom £48.13Average lead time: 13 days
- Folding 100/100 TEM Support GridsFolding TEM support grids. 100/100 mesh, 3.05mm diameter. Copper, Copper/Palladium, Gold, Stainless Steel, Molybdenum or Titanium. Special prices valid while stocks last.Average lead time: 1 to 29 daysFrom £32.70Average lead time: 1 to 29 days
- Folding 100/200 TEM Support GridsFolding TEM support grids. 100/200 mesh, 3.05mm diameter. Copper, Copper/Palladium, Nickel, Gold, Molybdenum. Special prices valid while stocks last.Average lead time: 1 to 13 daysFrom £32.69Average lead time: 1 to 13 days
- Folding 100/300 TEM Support GridsFolding TEM support grids. 100/300 mesh, 3.05mm diameter. Stainless Steel or Titanium.Average lead time: 13 to 44 daysFrom £57.70Average lead time: 13 to 44 days
- Hexagonal Pattern 50 Mesh TEM Support GridsHexagonal pattern, 50 mesh grids offer an alternative to the standard square mesh pattern, providing maximum support for any given mesh repeat distance. Copper, Copper/Palladium, Nickel or Gold. Special prices valid while stocks last.Average lead time: 1 to 13 daysFrom £18.62Average lead time: 1 to 13 days
- Hexagonal Pattern 75 Mesh TEM Support GridsHexagonal pattern, 75 mesh grids offer an alternative to the standard square mesh pattern, providing maximum support for any given mesh repeat distance. Copper, Copper/Palladium, Nickel or Gold.Average lead time: 6 to 13 daysFrom £20.31Average lead time: 6 to 13 days
- Hexagonal Pattern 150 Mesh TEM Support GridsHexagonal pattern, 150 mesh grids offer an alternative to the standard square mesh pattern, providing maximum support for any given mesh repeat distance. Copper, Copper/Palladium, Nickel or Gold.Average lead time: 1 to 29 daysFrom £22.29Average lead time: 1 to 29 days
- Hexagonal Pattern 200 Mesh TEM Support GridsHexagonal pattern, 200 mesh grids offer an alternative to the standard square mesh pattern, providing maximum support for any given mesh repeat distance. Copper, Copper/Palladium, Nickel or Gold.Average lead time: 1 to 29 daysFrom £22.56Average lead time: 1 to 29 days
- Hexagonal Pattern 400 Mesh TEM Support GridsHexagonal pattern, 400 mesh grids offer an alternative to the standard square mesh pattern, providing maximum support for any given mesh repeat distance. Copper or Gold.Average lead time: 1 to 13 daysFrom £22.98Average lead time: 1 to 13 days
- Thin Bar, High Transmission 200 Mesh TEM Support Grids200 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper or Gold.Average lead time: 1 to 13 daysFrom £36.47Average lead time: 1 to 13 days
- Thin Bar, High Transmission 300 Mesh TEM Support Grids300 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 13 daysFrom £43.47Average lead time: 13 days
- Thin Bar, High Transmission 400 Mesh TEM Support Grids400 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 6 to 13 daysFrom £55.05Average lead time: 6 to 13 days
- Thin Bar, High Transmission 600 Mesh TEM Support Grids600 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 13 to 29 daysFrom £60.52Average lead time: 13 to 29 days
- Thin Bar, Hex 200 Mesh TEM Support Grids200 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 1 to 13 daysFrom £36.47Average lead time: 1 to 13 days
- Thin Bar, Hex 300 Mesh TEM Support Grids300 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 1 to 13 daysFrom £42.22Average lead time: 1 to 13 days
- Thin Bar, Hex 400 Mesh TEM Support Grids400 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 1 to 13 daysFrom £55.05Average lead time: 1 to 13 days
- Thin Bar, Hex 600 Mesh TEM Support Grids600 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 1 to 13 daysFrom £60.52Average lead time: 1 to 13 days
- Thin Bar, Hex 700 Mesh TEM Support Grids700 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 1 to 13 daysFrom £41.13Average lead time: 1 to 13 days
- Thin Bar, Mixed Mesh TEM Support GridsMixed mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 1 dayFrom £42.22Average lead time: 1 day
- Fine Square Pattern, 1000 Mesh TEM Support GridsAdvanced manufacturing techniques allow the production of very fine mesh grids with high transmission characteristics. Square pattern, 1000 Mesh TEM Support Grids. Copper, Nickel or Gold.Average lead time: 1 to 13 daysFrom £38.66Average lead time: 1 to 13 days