Standard grade TEM support grids are available in copper, nickel or gold, or in copper with one side flash coated with palladium for identification purposes. All grids are available in 3.05mm diameter and some in 2.3mm diameter. All Agar grids are packed in tubes of 100, unless otherwise specified. A comprehensive table of grid parameters is available on request.
- Extensive range of grids for TEM applications
- Square, hexagonal, rectangular, parallel, slot & round mesh shapes
- Finder & folding grids
- 50, 75, 150, 200, 300, 400, 600, 700, 1000, 1500 & 2000 mesh
- Copper, nickel, gold, gilded & platinised
- Special metals: aluminium, molybdenum, stainless steel & titanium
- Square Pattern 300 Mesh TEM Support Grids300 mesh, square pattern, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel, Gold, Aluminium, Molybdenum & Stainless Steel. Special prices valid while stocks last.Average lead time: 1 dayFrom £20.45Average lead time: 1 day
- Parallel Bar 300 Mesh TEM Support Grids300 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 1 to 12 daysFrom £14.50Average lead time: 1 to 12 days
- Parallel Bar 300 Mesh with Single Bar TEM Support Grids300 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 12 daysFrom £22.30Average lead time: 12 days
- Thin Bar, High Transmission 300 Mesh TEM Support Grids300 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 12 daysFrom £43.47Average lead time: 12 days
- Thin Bar, Hex 300 Mesh TEM Support Grids300 mesh thin bar grids are designed to give the highest transmission to maximise the viewable area of the specimen. Copper, Nickel or Gold.Average lead time: 1 to 12 daysFrom £42.22Average lead time: 1 to 12 days
- Square Pattern, 300 Mesh, Tabbed TEM Support GridsTabbed grids offer easier handling and help to avoid contamination, allowing grids to be held securely for spraying, rinsing and drying.Square pattern, 300 mesh. Copper, Nickel or Gold.Average lead time: 12 to 19 daysFrom £24.81Average lead time: 12 to 19 days