Parallel bar pattern grids for TEM applications.
- 50, 75, 100, 150, 200, 300 & 400 mesh
- Copper, nickel, copper/palladium & gold
- 3.05mm diameter
- Parallel Bar 50 Mesh TEM Support Grids50 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 1 to 12 days
POA
Average lead time: 1 to 12 days - Parallel Bar 75 Mesh TEM Support Grids75 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold.Average lead time: 1 to 12 days
POA
Average lead time: 1 to 12 days - Parallel Bar 100 Mesh TEM Support Grids100 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold.Average lead time: 12 days
POA
Average lead time: 12 days - Parallel Bar 150 Mesh TEM Support Grids150 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 1 to 12 days
POA
Average lead time: 1 to 12 days - Parallel Bar 200 Mesh TEM Support Grids200 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold.Average lead time: 12 days
POA
Average lead time: 12 days - Parallel Bar 300 Mesh TEM Support Grids300 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 12 days
POA
Average lead time: 12 days - Parallel Bar 400 Mesh TEM Support Grids400 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 1 to 12 days
POA
Average lead time: 1 to 12 days - Parallel Bar 50 Mesh with Single Bar TEM Support Grids50 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids. Special prices valid while stocks last.Average lead time: 1 to 12 days
POA
Average lead time: 1 to 12 days - Parallel Bar 75 Mesh with Single Bar TEM Support Grids75 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 1 to 12 days
POA
Average lead time: 1 to 12 days - Parallel Bar 100 Mesh with Single Bar TEM Support Grids100 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 1 to 12 days
POA
Average lead time: 1 to 12 days - Parallel Bar 150 Mesh with Single Bar TEM Support Grids150 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 12 days
POA
Average lead time: 12 days - Parallel Bar 200 Mesh with Single Bar TEM Support Grids200 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 12 days
POA
Average lead time: 12 days - Parallel Bar 300 Mesh with Single Bar TEM Support Grids300 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 12 days
POA
Average lead time: 12 days - Parallel Bar 400 Mesh with Single Bar TEM Support Grids400 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids. Special prices valid while stocks last.Average lead time: 1 to 43 days
POA
Average lead time: 1 to 43 days