- Metal Mounting Clips, pack of 100 AGB8837Metal clips ideal for holding thin samples during cross-sectioning.Average lead time: 13 days
POA
Average lead time: 13 days - Two part plastic embedding moulds2-part plastic embedding moulds, 1in (25.4.mm), 1 1/4in (32mm) and 1 1/2in (38mm) diameters.Average lead time: 1 to 13 days
POA
Average lead time: 1 to 13 days - Silicone Rubber MouldsReusable moulds for cold embedding, made from sturdy, flexible white or blue silicone which does not deform over time.Average lead time: 1 to 13 days
POA
Average lead time: 1 to 13 days