- Kemet Diamond Polishing PasteVarious grades of diamond polishing paste are available.Average lead time: 1 to 8 days
POA
Average lead time: 1 to 8 days - Diamond Polishing Paste LubricantBoth oil based (OS type) and water based (W type) lubricants are available for use with Kemet polishing pastes.Average lead time: 1 to 8 days
POA
Average lead time: 1 to 8 days - Abrasive PowdersA range of silicon carbide and alumina abrasives for fine lapping or grinding of samples on surfaces such as cast iron, tin, lead or cloth covered wheels.Average lead time: 8 to 39 days
POA
Average lead time: 8 to 39 days - Abrasive Strips - Aluminium OxideA range of Aluminium Oxide abrasive strips and sheets with resin-bonded polishing powder on a polyester backing. Special prices valid while stocks last.Average lead time: 1 to 22 days
POA
Average lead time: 1 to 22 days - Abrasive Strips - DiamondA range of diamond abrasive strips and sheets with resin-bonded polishing powder on a polyester backing. Special prices valid while stocks last.Average lead time: 1 to 24 days
POA
Average lead time: 1 to 24 days - Abrasive Strips - Silicon CarbideA range of abrasive strips and sheets with resin-bonded polishing powder on a polyester backing. Special prices valid while stocks last.Average lead time: 1 to 24 days
POA
Average lead time: 1 to 24 days - Polishing Cloths and DiscsA range of polishing cloths and discs suitable for use with rotary polishers.Average lead time: 1 to 15 days
POA
Average lead time: 1 to 15 days - Self Adhesive Silicon Carbide Paper DiscsSuitable for most makes of rotary grinders/polishers, these waterproof, self adhesive silicon carbide discs (PSA backed) are available in a range of grit sizes from P60 (269 µm) to P2500 (10 µm). Special prices valid while stocks last.Average lead time: 1 to 15 days
POA
Average lead time: 1 to 15 days - Silicon Carbide Pre-Grinding Paper DiscsWaterproof silicon carbide papers are often preferred for pre-grinding operations because of their rapid cutting properties and close grain size. Special prices valid while stocks last.Average lead time: 1 to 15 days
POA
Average lead time: 1 to 15 days - Ultraprep diamond lapping filmsUltraprep lapping films offer an alternative to diamond impregnated cloths where uniform material removal and surface flatness are essential.Average lead time: 1 to 15 days
POA
Average lead time: 1 to 15 days