Menu
ORDER ONLINE - quick & easy
AGENTS & DISTRIBUTORS - available worldwide
REQUEST QUOTES - fast online pricing
Filters

21 products available

You've viewed 21 of 21 products

  1. Metal Universal HPF & Grid Boxes
    Metal Universal HPF & Grid Boxes with unique serial number for High Pressure Freezing Hats, as well as cryo-EM grids and autogrids.  
    Average lead time: 12 days

    POA

    Average lead time: 12 days
  2. 8-Pocket Cryo Grid Boxes
    8-Pocket Grid Boxes for storing 8 unclipped grids in one grid box, each with unique 5 digit serial number.  
    Average lead time: 12 days

    POA

    Average lead time: 12 days
  3. Metal Cryo Grid Box
    Metal grid storage boxes designed for use in cryogenic conditions.
    Average lead time: 1 day

    POA

    Average lead time: 1 day
  4. Plastic Cryo Grid Box
    Tested for biodegradability and durability, these plastic grid boxes are available in 3 different colours for maximum contrast. Suitable for use with both unclipped and clipped standard 3 mm electron microscopy grids.  Special prices valid while stocks last. 
    Average lead time: 1 to 19 days

    POA

    Average lead time: 1 to 19 days
  5. Hybrid Cryo Grid Box
    Hybrid cryo-EM sample storage boxes from NanoSoft, with unqiue serial number and dedicated wells for both unclipped grids and autogrids. Available with pin lid or without pin lid.
    Average lead time: 1 to 12 days

    POA

    Average lead time: 1 to 12 days
  6. Bulk Storage Cryo Grid Box
    Bulk storage grid boxes from NanoSoft with unique serial number designed to accomodate an entire 12-grid cassette.
    Average lead time: 12 days

    POA

    Average lead time: 12 days
  7. Pin Lid for Cryo Grid Box AGK120
    NanoSoft pin lids for use with NanoSoft hybrid cryo grid boxes and NanoSoft bulk storage cryo grid boxes. 
    Average lead time: 12 days

    POA

    Average lead time: 12 days
    Down
    Up
  8. Quick Lid AGK124
    Easy-to-use lid from NanoSoft for grid boxes during vitrification sessions to protect already frozen grids until the session is complete.
    Average lead time: 12 days

    POA

    Average lead time: 12 days
    Down
    Up
  9. Cryo-EM Pucks
    Cryo-pucks for organised storage and transport for Cryo-EM specimen grids under cryogenic conditions.
    Average lead time: 1 to 12 days

    POA

    Average lead time: 1 to 12 days
  10. Cryo-EM Puck Accessories
    Storage and shipping accessories for use with the Cryo-EM pucks.
    Average lead time: 1 to 12 days

    POA

    Average lead time: 1 to 12 days
  11. Cryo-EM Puck Starter Kit AGB5001
    A complete set of pucks and tools for Cryo-EM storage and transport under cryogenic conditions.
    Average lead time: 28 days

    POA

    Average lead time: 28 days
    Down
    Up
  12. Cryo-EM Locking Puck Starter Kit AGB5001-M
    A complete set of pucks and tools for Cryo-EM storage and transport under cryogenic conditions.
    Average lead time: 28 days

    POA

    Average lead time: 28 days
    Down
    Up
  13. Cryo-EM Storage Cane Starter Kit AGB5008
    A complete set of pucks and tools for Cryo-EM storage and transport under cryogenic conditions.
    Average lead time: 28 days

    POA

    Average lead time: 28 days
    Down
    Up
  14. Cryo-EM Full Kit - Six Full Canes AGB5009
    Six complete sets of pucks for Cryo-EM storage and transport under cryogenic conditions.
    Average lead time: 28 days

    POA

    Average lead time: 28 days
    Down
    Up
  15. Dual-hook system for Cryo-EM shipping cane AGG5009
    Dual-hook system for shipping cane with thermal insulator and locking mechanism.
    Average lead time: 28 days

    POA

    Average lead time: 28 days
    Down
    Up
  16. Cryo TEM grid boxes
    These cryo grid boxes are used for transferring, storing and manipulating vitrified cryo TEM specimens made with cryo devices.
    Average lead time: 1 to 28 days

    POA

    Average lead time: 1 to 28 days
  17. Cryo Pin Storage Boxes
    Clear, styrene storage boxes with dense, closed cell foam inserts for Cryo Specimen Pins. 
    Average lead time: 28 days

    POA

    Average lead time: 28 days
  18. Multicolour Cryo Grid Box Handling Rods
    Available in four different colours, the handling rod screws into the threaded centre of the round cryo grid box for pick-up and storage applications.
    Average lead time: 1 to 12 days

    POA

    Average lead time: 1 to 12 days
  19. Cryo EM round storage box, 4 hole, to fit FEI Vitrobot AGG3736
    4-hole Cryo-EM storage box to fit FEI Vitrobot.
    In Stock

    POA

    In Stock
    Down
    Up
  20. Cryo-Gripper AGT1002
    Cryo-Gripper for easy retrieval of the Metal Cryo Grid boxes.
    In Stock

    POA

    In Stock
    Down
    Up
  21. Shelved Puck Shipping Cane (ALS Style) AGB5005
    This set includes a shelved shipping cane, locking rod and hooked handle.
    Average lead time: 12 days

    POA

    Average lead time: 12 days
    Down
    Up
Filters

21 products available

You've viewed 21 of 21 products

PRICE & AVAILABILITY: Please note that while we are working closely with our suppliers to minimise any global supply chain issues, prices and availability may be subject to change at short notice.
FILTERS
VIEW PRODUCTS Cancel