- 1500um Hole TEM Support GridsSingle 1500μm hole TEM support grids. 3.05mm diameter. Available in Copper, Copper/Palladium, Nickel, Gold, Aluminium, Molybdenum, Stainless Steel or Titanium.Average lead time: 1 to 19 days
POA
Average lead time: 1 to 19 days - Square Pattern, 200 Mesh, Tabbed TEM Support GridsTabbed grids offer easier handling and help to avoid contamination, allowing grids to be held securely for spraying, rinsing and drying.Square pattern, 200 mesh. Copper, Nickel or Gold.Average lead time: 12 to 28 days
POA
Average lead time: 12 to 28 days - Tabbed grids - CopperTabbed grids offer easier handling and help to avoid contamination, allowing grids to be held securely for spraying, rinsing and drying.Average lead time: 1 to 43 days
POA
Average lead time: 1 to 43 days - Athene 1000um Single Hole TEM GridsSingle 1000μm hole grids, 3.05mm diameter. Copper, Nickel, Platinised or Gilded.Average lead time: 1 to 26 days
POA
Average lead time: 1 to 26 days - Athene Type 7, 200 Mesh Thin Bar TEM GridsThin bar grids for high transmission. 200 mesh, 3.05mm diameter. Copper, Nickel, Platinised or Gilded. Special prices valid while stocks last.Average lead time: 1 to 26 days
POA
Average lead time: 1 to 26 days - Rectangular Pattern 400 x 100 Mesh Support TEM Grids400 x 100 mesh, rectangular pattern, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold.Average lead time: 1 to 12 days
POA
Average lead time: 1 to 12 days - Apertures, 10.0 x 0.6mm, Platinum/Iridium10mm dia, 0.6mm thick. Platinum/iridium. High-quality disc apertures for use in electron microscopes, Focus Ion Beam, microprobe and X-ray systems.Average lead time: 43 to 68 days
POA
Average lead time: 43 to 68 days - Wehnelt AperturesReplaceable apertures for the Wehnelt cylinder can be supplied to fit some microscopes. Special prices valid while stocks last.Average lead time: 43 to 58 days
POA
Average lead time: 43 to 58 days - Silicon nitride membranes - 200um substrate thickness200µm substrate thickness with membrane thicknesses from 20nm to 500nm. Special prices valid while stocks last.Average lead time: 1 to 58 days
POA
Average lead time: 1 to 58 days - Apertures, 2.0 x 0.1mm, Platinum/Iridium2mm dia, 0.1mm thick. Platinum/iridium. High quality disc apertures for use in electron microscopes, Focus Ion Beam, microprobe and X-ray systems. Special prices valid while stocks last.Average lead time: 1 to 68 days
POA
Average lead time: 1 to 68 days - K-kit for Liquid TEM, AccessoriesA range of tools and consumables for use with the K-kit for liquid TEM. Special prices valid while stocks last.Average lead time: 1 to 28 days
POA
Average lead time: 1 to 28 days - Nanopore in 200nm Silicon Nitride Membrane, Square Arrangement500μm x 500μm aperture in 200nm low-stress silicon nitride membrane. 8 nanopore sizes. Square arrangement. Pack of 10.Average lead time: 1 to 28 days
POA
Average lead time: 1 to 28 days - Quantifoil R3.5/1 holey carbon films - CircularCircular hole, size 3.5µm dia, separation 1µm, pitch 4.5µm. Special prices valid while stocks last.Average lead time: 1 to 178 days
POA
Average lead time: 1 to 178 days - Holey carbon films - NickelHoley carbon films have many uses in microscopy but for certain applications the mesh sizes of standard TEM grids are too large to support the sample. Nickel. Special prices valid while stocks last.Average lead time: 1 to 26 days
POA
Average lead time: 1 to 26 days - Formvar films - NickelFormvar coated grids without a carbon layer are suitable for TEM applications up to 100kV. NickelAverage lead time: 1 to 118 days
POA
Average lead time: 1 to 118 days - Phenofree Hot Mounting ResinsPhenol-free and formaldehyde-free thermosetting mounting resins.Average lead time: 33 days
POA
Average lead time: 33 days - PTFE Immunostaining Pad AGG3765This immunostaining pad made from Teflon is resistant to most chemicals and easy to clean.Average lead time: 12 days
POA
Average lead time: 12 days - Snap-Fit Gelatin CapsulesSnap-Fit® gelatin capsules, useful for embedding specimens and storage of small items.Average lead time: 12 days
POA
Average lead time: 12 days - Microcentrifuge TubesTransparent polypropylene, 1.5ml microcentrifuge tubes with 0.5ml graduations. Special prices valid while stocks last.Average lead time: 1 to 12 days
POA
Average lead time: 1 to 12 days - TEM Grid Holder on SEM Pin StubA pin-type aluminium stub allowing four TEM grids to be securely held for SEM work. Special prices valid while stocks last.Average lead time: 43 to 58 days
POA
Average lead time: 43 to 58 days - Formvar Carbon Films on GoldThin cast films of Formvar strengthened with the addition of a layer of evaporated carbon on gold grids. Special prices valid while stocks last.Average lead time: 1 to 26 days
POA
Average lead time: 1 to 26 days - Formvar Films - GoldFormvar coated grids without a carbon layer are suitable for TEM applications up to 100kV. Gold. Special prices valid while stocks last.Average lead time: 1 to 26 days
POA
Average lead time: 1 to 26 days - Carbon Films on Gold GridsThis range of carbon films has been prepared to provide a very convenient, ready-to-use specimen support. Special prices valid while stocks last.Average lead time: 1 to 53 days
POA
Average lead time: 1 to 53 days - Quantifoil R2/1 holey carbon films - CircularCircular hole, size 2µm dia, separation 1µm, pitch 3µm.Average lead time: 1 to 178 days
POA
Average lead time: 1 to 178 days