- Stage micrometers with NPL certificate for transmitted lightThe NPL, the UK's National Metrology Institute, is a world-leading centre of excellence in developing and applying the most accurate measurement standards.Average lead time: 11 to 42 days
From £1,240.16
Average lead time: 11 to 42 days - Stage micrometers with NPL certificate for reflected lightThe NPL, the UK's National Metrology Institute, is a world-leading centre of excellence in developing and applying the most accurate measurement standards.Average lead time: 42 days
POA
Average lead time: 42 days - NPL image analysis standard AGS1918This high precision standard is designed for calibrating image analysis systems and identifying deviations and distortions in optical imaging equipment.Average lead time: 57 days
POA
Average lead time: 57 days