- Parallel Bar 75 Mesh TEM Support Grids75 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold.Average lead time: 1 to 11 days
From £20.31
Average lead time: 1 to 11 days - Parallel Bar 100 Mesh TEM Support Grids100 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold.Average lead time: 11 days
From £20.31
Average lead time: 11 days - Parallel Bar 200 Mesh TEM Support Grids200 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold.Average lead time: 11 days
From £22.29
Average lead time: 11 days - Parallel Bar 75 Mesh with Single Bar TEM Support Grids75 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 1 to 11 days
From £13.80
Average lead time: 1 to 11 days - Parallel Bar 100 Mesh with Single Bar TEM Support Grids100 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 1 to 11 days
From £13.80
Average lead time: 1 to 11 days - Parallel Bar 150 Mesh with Single Bar TEM Support Grids150 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 11 days
From £22.29
Average lead time: 11 days - Parallel Bar 200 Mesh with Single Bar TEM Support Grids200 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 11 days
From £22.29
Average lead time: 11 days - Parallel Bar 300 Mesh with Single Bar TEM Support Grids300 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 11 days
From £22.30
Average lead time: 11 days - Parallel Bar 50 Mesh TEM Support Grids50 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 1 to 11 daysFrom £13.80Average lead time: 1 to 11 days
- Parallel Bar 75 Mesh TEM Support Grids75 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold.Average lead time: 1 to 11 daysFrom £20.31Average lead time: 1 to 11 days
- Parallel Bar 100 Mesh TEM Support Grids100 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold.Average lead time: 11 daysFrom £20.31Average lead time: 11 days
- Parallel Bar 150 Mesh TEM Support Grids150 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 1 to 11 daysFrom £15.15Average lead time: 1 to 11 days
- Parallel Bar 200 Mesh TEM Support Grids200 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold.Average lead time: 11 daysFrom £22.29Average lead time: 11 days
- Parallel Bar 300 Mesh TEM Support Grids300 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 1 to 11 daysFrom £14.50Average lead time: 1 to 11 days
- Parallel Bar 400 Mesh TEM Support Grids400 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 1 to 11 daysFrom £20.35Average lead time: 1 to 11 days
- Parallel Bar 50 Mesh with Single Bar TEM Support Grids50 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids. Special prices valid while stocks last.Average lead time: 1 to 11 daysFrom £13.80Average lead time: 1 to 11 days
- Parallel Bar 75 Mesh with Single Bar TEM Support Grids75 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 1 to 11 daysFrom £13.80Average lead time: 1 to 11 days
- Parallel Bar 100 Mesh with Single Bar TEM Support Grids100 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 1 to 11 daysFrom £13.80Average lead time: 1 to 11 days
- Parallel Bar 150 Mesh with Single Bar TEM Support Grids150 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 11 daysFrom £22.29Average lead time: 11 days
- Parallel Bar 200 Mesh with Single Bar TEM Support Grids200 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 11 daysFrom £22.29Average lead time: 11 days
- Parallel Bar 300 Mesh with Single Bar TEM Support Grids300 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids.Average lead time: 11 daysFrom £22.30Average lead time: 11 days
- Parallel Bar 400 Mesh with Single Bar TEM Support Grids400 mesh, parallel bar with Copper, Copper/Palladium, Nickel or Gold single bar. 3.05mm diameter TEM grids. Special prices valid while stocks last.Average lead time: 1 to 42 daysFrom £15.83Average lead time: 1 to 42 days
- Parallel Bar 50 Mesh TEM Support Grids50 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 1 to 11 days
From £13.80
Average lead time: 1 to 11 days - Parallel Bar 150 Mesh TEM Support Grids150 mesh, parallel bar, 3.05mm diameter TEM grids. Available in Copper, Copper/Palladium, Nickel & Gold. Special prices valid while stocks last.Average lead time: 1 to 11 days
From £15.15
Average lead time: 1 to 11 days